STANDARD EQUIPMENT:
• 3 – point linkage cat. II, box type
• 3m, 4m – mechanical unfolding, 1 cylinder
• 4m, 5m, 6m – hydraulic unfloding, 1 cylinder
• 8m – hydraulic unfloding (2 cylinders)
• 4 rows of heavy casts
• Mechanical lock for transport
• Cast section connected with frame by shackles
• Skids for harrows width 5-8 m
• Powder coated